THE BOWEN PIPELINE PROJECT
Building infrastructure for the future of North Queensland


The Bowen Pipeline Project (BPC) is a proposed 182 km underground water pipeline network, comprising 116 km of mainline infrastructure and 66 km of branch connections, extending from the Burdekin region south toward Bowen.
The project proposes to secure existing available water allocations from the Burdekin Falls Dam through Sunwater and local water allocation holders to support future regional growth, agriculture, industry and long-term development opportunities across North Queensland.
The underground pipeline corridor has been designed to generally follow the Bruce Highway alignment, primarily across private land and unformed road reserves, helping minimise environmental, visual and community impacts.
To support project development, BPC has secured agreements with impacted private landowners, established a draft Infrastructure Agreement with the Department of Transport and Main Roads (DTMR), entered into an Early Works Deed with Economic Development Queensland (EDQ) for the Abbot Point State Development Area (APSDA), and continues to receive strong support from both the Whitsunday Regional Council and Burdekin Shire Council.

The Bowen Pipeline Project has been developed through collaboration with Traditional Owners, regional communities, growers and industry stakeholders across North Queensland.
The project is community-led and backed by more than 60 grower, industry and regional investors, many based throughout the Bowen and Burdekin regions, who share a long-term vision for sustainable regional growth and future opportunity.
To date, more than $8 million has been invested by project stakeholders, alongside $5 million in Commonwealth funding support for engineering and design activities helping progress the project toward future delivery.
The project is also expected to support regional economic activity across Townsville, Ayr, Bowen, Proserpine, Mackay and surrounding areas through construction, logistics, accommodation, materials supply and long-term operational support, with the Port of Townsville and Port of Mackay expected to play a key role during construction.
The broader vision is to support long-term regional opportunity through:
- agriculture
- export growth
- industry development
- and future international market opportunities
The intended agricultural water supply aims to support expanding export markets for high-grade fresh and value-added produce across key international trading regions including Japan, Singapore, South Korea, India, Saudi Arabia, Taiwan, New Zealand and the United States.

The Bowen Pipeline Project proposes the use of High-Density Polyethylene (HDPE) pipeline infrastructure due to its long-term performance, construction efficiency and sustainability benefits. HDPE pipeline systems are widely used throughout major water infrastructure projects because they are:
- durable
- flexible
- corrosion resistant
- and designed for long operational life
The project also intends to utilise HDPE pipe lengths exceeding 100 metres, helping reduce truck movements, minimise welding requirements and improve construction efficiency across the project corridor.
Using longer HDPE pipe lengths significantly reduces the number of welded joints required throughout the pipeline system compared with traditional materials, helping support long-term operational reliability while reducing construction impacts and installation time.
The use of HDPE infrastructure also helps support lower construction-related emissions through reduced transport requirements and improved installation efficiencies.

Reliable long-term water infrastructure has the potential to support expanded agricultural production, future crop diversification and broader regional industry opportunities across North Queensland.
The project aims to help support the growth of existing agricultural industries, including citrus and macadamias, while also enabling future opportunities for higher value crops such as legumes, mung beans, millet and chia.
Improved access to reliable water infrastructure may also help support future aquaculture opportunities by reducing reliance on high-cost desalination processes and improving long term operational efficiency.
As a community-led and community-funded initiative, the Bowen Pipeline Project is focused on supporting long-term regional prosperity while maintaining a strong commitment to sustainability, local communities and the future of the region.
The Bowen Pipeline Project is being developed with a strong focus on long-term regional sustainability, resilient infrastructure and future-focused development across North Queensland.
The project aims to support sustainable outcomes through:
- efficient long-term water infrastructure,
- reduced reliance on groundwater resources,
- modern construction approaches,
- and infrastructure designed for long operational performance.
The broader vision is to help support regional growth while maintaining a strong commitment to environmental responsibility, future generations and sustainable regional development.

Queensland’s first Net Zero pipeline vision
The project intends to incorporate modern technologies and future focused construction approaches designed to support lower emission infrastructure outcomes.
Secure your water allocation


